logo
FAMOUS Steel Engineering Company
products
products
Home > products > Industrial Steel Buildings > Large Steel Shed Warehouse Web Truss Rafters UB UC Columns Hot Dip Galvanized Industrial Steel Buildings

Large Steel Shed Warehouse Web Truss Rafters UB UC Columns Hot Dip Galvanized Industrial Steel Buildings

Product Details

Place of Origin: Zhejiang, China

Brand Name: FAMOUS

Certification: ISO 9001

Model Number: Large Steel Shed Frame

Payment & Shipping Terms

Minimum Order Quantity: 1000

Price: USD 12-20/SQM

Packaging Details: Steel strapped bundles with edge protection, marked with profile, thickness and length, loaded in 20ft or 40ft container

Delivery Time: 15 to 25 days after drawing confirmation

Payment Terms: L/C,D/A,D/P,T/T

Supply Ability: 2,000 – 5,000 MT/month

Get Best Price
Highlight:

large steel shed

,

steel warehouse shed

,

galvanized truss rafter

Frame Type:
Portal Frame With UB And UC Members
Columns:
Universal Column UC Or Universal Beam UB Set By Design
Rafters:
Web Truss Rafters With UB Or UC Chords And Welded Web Members
Span:
Clear Span Or Multi Span Set By Layout
Surface Treatment:
Hot Dip Galvanized After Fabrication
Secondary Framing:
Galvanized C Or Z Purlins And Girts With Bracing
Cladding:
Single Skin Or Insulated Sandwich Panel As Specified
Openings:
Framed Openings To Door Window And Louver Schedule
Design Basis:
Wind Region Roof Load Seismic Crane And Mezzanine As Applicable
Documents:
GA And Erection Drawings Anchor Plan Coating Report And Packing List
Packing:
Bundled By Piece Mark In Erection Sequence
Erection:
Bolted Site Assembly With Piece Marked Members
Frame Type:
Portal Frame With UB And UC Members
Columns:
Universal Column UC Or Universal Beam UB Set By Design
Rafters:
Web Truss Rafters With UB Or UC Chords And Welded Web Members
Span:
Clear Span Or Multi Span Set By Layout
Surface Treatment:
Hot Dip Galvanized After Fabrication
Secondary Framing:
Galvanized C Or Z Purlins And Girts With Bracing
Cladding:
Single Skin Or Insulated Sandwich Panel As Specified
Openings:
Framed Openings To Door Window And Louver Schedule
Design Basis:
Wind Region Roof Load Seismic Crane And Mezzanine As Applicable
Documents:
GA And Erection Drawings Anchor Plan Coating Report And Packing List
Packing:
Bundled By Piece Mark In Erection Sequence
Erection:
Bolted Site Assembly With Piece Marked Members
Large Steel Shed Warehouse Web Truss Rafters UB UC Columns Hot Dip Galvanized Industrial Steel Buildings
Industrial Steel Buildings

Large Steel Shed and Warehouse Frames in Galvanized UB and UC Sections

A complete steel frame for a large shed or warehouse: universal column UC verticals, web truss rafters over the span, and the whole package fabricated to your drawing and hot dip galvanized before shipment.

Large Steel Shed Warehouse Web Truss Rafters UB UC Columns Hot Dip Galvanized Industrial Steel Buildings

01 What The Package Is

This is the structural frame, supplied as one coordinated set: columns, rafters, bracing, purlins, connections and the drawings that tie them together. The cladding, doors and insulation are configured around the frame, which is why the frame is detailed first.

There is no standard size behind this listing. Span, bay spacing, eave height, roof pitch and wind region are all inputs, not options, and the frame is engineered from them. That is also why two buildings of the same floor area can arrive with different section sizes and different steel tonnage.

02 The Two Members That Decide Everything

Universal columns carry the load down. The column is a rolled universal column UC section in most cases, because the UC profile puts more material in the flanges where a compression member needs it, and it is deeper than it is wide, which suits the bending that wind and any crane bracket introduce. Where the design calls for a wider flange in the column position, a universal beam UB section is used instead. Base plates, stiffeners and knee plates are welded and drilled in the shop, so the connection on site is bolting only.

Web truss rafters carry the load across. The rafter is fabricated from a top chord and a bottom chord in UB or UC, tied together by welded vertical and diagonal web members. Depth is built from geometry rather than from steel mass, so a long span is carried without a very deep solid section. The depth also becomes a usable zone for lighting, cable trays and sprinkler runs, which is space a solid rafter does not offer.

Rolled or built upRolled sections where the range fits; welded built up H sections where the required depth or flange is outside it, without changing the connection concept.
Panel points set the detailPurlin lines, brace points and splices land on truss panel points, so loads enter the member where the geometry can carry them.
Deflection decides the sizeOn a large roof the cladding and drainage fall usually govern before the stress does, so the rafter is sized against deflection, not only strength.
Two routes in one frameRepeat bays can use rolled sections while long span or heavy load bays use built up members, in the same building.

03 Galvanizing, and Why The Sequence Matters

Galvanizing is applied after the member is fully fabricated. That order is the whole point: the zinc reaches the cut ends, the inside of every bolt hole, the back of every cleat and the weld toes, which are the places a paint system cannot reach and the places corrosion starts.

  • No post-coating work. A hole drilled or a cut made after dipping leaves bare steel inside the opening, so all cutting, drilling and welding are completed first.
  • Vented and drained. Any closed member gets vent and drain holes positioned in the detail, so zinc enters and drains and no air pocket is trapped inside.
  • Coating class matched to site. A rural shed, a coastal warehouse and a fertilizer store should not carry the same coating specification, even when the frame drawing is identical.
  • Verified, not assumed. Coating mass and thickness are measured and reported per batch, and issued with the mill certificates for each heat number.
  • Duplex where colour is required. A primer and top coat system can be applied over the zinc when a finished colour is specified.

Large Steel Shed Warehouse Web Truss Rafters UB UC Columns Hot Dip Galvanized Industrial Steel Buildings

04 Four Inputs That Drive Steel Weight

SpanThe single biggest driver. Bending rises with span, so rafter depth and column section follow it, and beyond a point the rafter has to become a truss.
Bay spacingWider bays mean fewer frames but heavier members and heavier purlins. There is a point where the two balance, and it is worth finding before the design is fixed.
Eave heightA taller column takes more bending from wind and from crane brackets, so height is not free even when the floor area does not change.
Wind and upliftOn exposed or cyclonic sites, uplift governs the column and the base far more than the roof live load does.

These four are why we ask for the site and the intended use at enquiry stage rather than quoting from a size list. A frame sized on assumptions usually comes back as either an over designed structure or a roof that sags under the cladding.

05 Configuration At A Glance

Item Detail
Columns Universal column UC as standard, or universal beam UB where a wider flange suits the design. Rolled or welded built up, fixed or pinned base, with base plates and stiffeners finished before coating.
Rafters Web truss rafters with UB or UC chords and welded vertical and diagonal web members. Truss depth and web pattern set by span, roof load and the available headroom.
Span Clear span, multi span or a mix, with bay spacing chosen against your racking or aisle layout rather than a default module.
Protection Hot dip galvanized after all fabrication, coating class matched to the site environment, with a coating report per batch and duplex top coat available.
Secondary Galvanized C or Z purlins and girts with bracing, sag rods and fly braces, so the secondary steel does not become the first item to corrode.
Design basis Wind region and terrain category, roof live and collateral load, deflection limits, seismic parameters and any crane or mezzanine load.
Documents 3D model, general arrangement drawings, erection drawings, anchor bolt setting plan, mill certificates, coating report and packing list.

06 What You Can Specify

Geometry

  • Span, length, bay spacing and number of frames
  • Eave height, ridge height and roof pitch, gable or monoslope
  • Clear span or multi span layout, and where internal columns may sit if any
  • Canopy, awning and loading dock framing

Frame

  • Column section and orientation, base fixity and knee detail
  • Rafter type, truss depth, chord section and web member pattern
  • Splices positioned for transport, bath and crane limits, then detailed as proper bolted joints
  • Crane runway beams, mezzanine framing and canopy brackets where required

Envelope

  • Purlin and girt spacing to suit the cladding and insulation system
  • Single skin sheeting, insulated sandwich panel or mixed systems
  • Roller doors, access doors, windows, louvers and skylights
  • Gutter, valley and downpipe arrangement coordinated with the frame

Large Steel Shed Warehouse Web Truss Rafters UB UC Columns Hot Dip Galvanized Industrial Steel Buildings

07 Delivery And Documents

  • Members are cut, welded, drilled, trial assembled where geometry matters, then piece marked
  • The frame is galvanized as a finished set and inspected, with a coating report issued
  • Members are bundled by piece mark with spacers between pieces to protect the coating
  • Loading follows the erection sequence, so the first frame is the first bundle at the site
  • Mill certificates per heat number travel with the shipment for traceability

08 How An Order Runs

  • You send span, length, eave height, roof pitch, wind region and intended use, with drawings if you have them.
  • We check the frame route and the tonnage, then quote the package.
  • General arrangement drawings and member details are issued for your approval.
  • Members are fabricated, trial assembled where required and piece marked.
  • The frame is hot dip galvanized and inspected, with a coating report issued.
  • Members are packed by piece mark and shipped in erection order.
Send your span and eave height We will detail the frame, check the tonnage and quote it.
Large Steel Shed Warehouse Web Truss Rafters UB UC Columns Hot Dip Galvanized Industrial Steel Buildings