Product Details
Place of Origin: Zhejiang, China
Brand Name: FAMOUS
Certification: ISO 9001
Model Number: Large Steel Shed Frame
Payment & Shipping Terms
Minimum Order Quantity: 1000
Price: USD 12-20/SQM
Packaging Details: Steel strapped bundles with edge protection, marked with profile, thickness and length, loaded in 20ft or 40ft container
Delivery Time: 15 to 25 days after drawing confirmation
Payment Terms: L/C,D/A,D/P,T/T
Supply Ability: 2,000 – 5,000 MT/month
Frame Type: |
Portal Frame With UB And UC Members |
Columns: |
Universal Column UC Or Universal Beam UB Set By Design |
Rafters: |
Web Truss Rafters With UB Or UC Chords And Welded Web Members |
Span: |
Clear Span Or Multi Span Set By Layout |
Surface Treatment: |
Hot Dip Galvanized After Fabrication |
Secondary Framing: |
Galvanized C Or Z Purlins And Girts With Bracing |
Cladding: |
Single Skin Or Insulated Sandwich Panel As Specified |
Openings: |
Framed Openings To Door Window And Louver Schedule |
Design Basis: |
Wind Region Roof Load Seismic Crane And Mezzanine As Applicable |
Documents: |
GA And Erection Drawings Anchor Plan Coating Report And Packing List |
Packing: |
Bundled By Piece Mark In Erection Sequence |
Erection: |
Bolted Site Assembly With Piece Marked Members |
Frame Type: |
Portal Frame With UB And UC Members |
Columns: |
Universal Column UC Or Universal Beam UB Set By Design |
Rafters: |
Web Truss Rafters With UB Or UC Chords And Welded Web Members |
Span: |
Clear Span Or Multi Span Set By Layout |
Surface Treatment: |
Hot Dip Galvanized After Fabrication |
Secondary Framing: |
Galvanized C Or Z Purlins And Girts With Bracing |
Cladding: |
Single Skin Or Insulated Sandwich Panel As Specified |
Openings: |
Framed Openings To Door Window And Louver Schedule |
Design Basis: |
Wind Region Roof Load Seismic Crane And Mezzanine As Applicable |
Documents: |
GA And Erection Drawings Anchor Plan Coating Report And Packing List |
Packing: |
Bundled By Piece Mark In Erection Sequence |
Erection: |
Bolted Site Assembly With Piece Marked Members |
A complete structural frame for a large shed or warehouse: universal column UC verticals, web truss rafters over the span, galvanized purlins and bracing, all fabricated to your drawing and hot dip galvanized before shipment.
![]()
This is the structural frame, supplied as one coordinated set: columns, rafters, bracing, purlins, connections, fixing accessories and the drawings that tie them together. The cladding, doors, insulation and ventilation are configured around the frame, which is why the frame is detailed first and the envelope follows.
There is no standard size behind this listing. Span, bay spacing, eave height, roof pitch and wind region are inputs rather than options, and the frame is engineered from them. Two buildings with the same floor area can therefore arrive with different section sizes, different connection details and different steel tonnage.
The package is quoted as a frame, not as a catalogue building, so the drawings you receive describe your building rather than a generic layout that has to be adapted on site.
Why UC for the vertical. A universal column section puts more material in the flanges and is deeper than it is wide, which suits a member carrying compression plus the bending that wind and any crane bracket introduce. It is the default for the column position, and it is rolled rather than fabricated, so the material is standard, traceable and available.
When a UB column is used. Where the design needs a wider flange in the vertical position, or where the connection geometry works better with a beam section, a universal beam UB is used as the column. The choice is made on the frame behaviour, not on availability.
When neither is enough. If the required depth or flange is outside the rolled range, the member is welded up from plate into an H section to the exact dimensions the design calls for. The connection concept does not change: the plate details are drawn the same way and the member is still galvanized after fabrication.
![]()
The rafter is fabricated from a top chord and a bottom chord in UB or UC, tied together by welded vertical and diagonal web members. Depth is built from geometry rather than from steel mass, so a long span is carried without a very deep solid section, and the self weight that has to be lifted and supported drops with it.
The open zone between the chords is usable space. Lighting, cable trays, sprinkler runs and ventilation sit inside the roof structure instead of hanging below it, which matters in a warehouse where the soffit line is already close to the racking height.
The frame only performs as a system. A rafter sized correctly is useless if the knee connection cannot transfer the moment, or if the roof plane is free to rack because the bracing was left out.
![]()
Galvanizing is applied after the member is fully fabricated. That order is the point: the zinc reaches the cut ends, the inside of every bolt hole, the back of every cleat and the weld toes, which are exactly the places a paint system cannot reach and the places corrosion starts.
These are why we ask for the site and the intended use at enquiry stage rather than quoting from a size list. A frame sized on assumptions usually comes back as either an over designed structure or a roof that sags under the cladding.
| Item | Detail |
|---|---|
| Columns | Universal column UC as standard, or universal beam UB where a wider flange suits the design. Rolled or welded built up, fixed or pinned base, with base plates, stiffeners and knee plates finished before coating. |
| Rafters | Web truss rafters with UB or UC chords and welded vertical and diagonal web members. Truss depth, chord size and web pattern set by span, roof load and available headroom. |
| Splices | Bolted site joints, positioned for transport length, galvanizing bath capacity and crane lifting limits, then detailed so the member reassembles into one line. |
| Span | Clear span, multi span or a mix, with bay spacing chosen against your racking or aisle layout rather than a default module. |
| Protection | Hot dip galvanized after all fabrication, coating class matched to the site environment, coating report per batch, duplex top coat available for colour. |
| Secondary | Galvanized C or Z purlins and girts with bracing, sag rods and fly braces, so the secondary steel does not become the first item to corrode. |
| Openings | Framed openings for roller doors, access doors, windows and louvers, with lintels and jambs sized for the opening and brackets drilled before coating. |
| Design basis | Wind region and terrain category, roof live and collateral load, deflection limits, seismic parameters, and any crane or mezzanine load. |
| Documents | 3D model, general arrangement drawings, erection drawings, anchor bolt setting plan, mill certificates, coating report and packing list. |
![]()
![]()