Product Details
Place of Origin: Zhejiang, China
Brand Name: FAMOUS
Certification: ISO 9001
Model Number: Web Truss Rafter Shed Frame
Payment & Shipping Terms
Minimum Order Quantity: 1000
Price: USD 12-20/SQM
Packaging Details: Steel strapped bundles with edge protection, marked with profile, thickness and length, loaded in 20ft or 40ft container
Delivery Time: 15 to 25 days after drawing confirmation
Payment Terms: L/C,D/A,D/P,T/T
Supply Ability: 2,000 – 5,000 MT/month
Rafter Type: |
Web Truss Rafter With UB Or UC Chords And Welded Web Members |
Truss Depth: |
Set By Clear Span Roof Load And Available Headroom |
Web Member Pattern: |
Vertical And Diagonal Layout Set At Design Stage |
Chord Section: |
Hot Rolled UB Or UC Or Welded Built Up Where The Range Does Not Fit |
Splices: |
Located At Panel Points And Matched To Transport Length |
Column Section: |
Galvanized Universal Column UC Or Welded Built Up H Section |
Surface Treatment: |
Hot Dip Galvanized After Fabrication |
Galvanizing Standard: |
As Named In Project Specification With Coating Class Matched To Site |
Secondary Framing: |
Galvanized C Or Z Purlins And Girts With Bracing And Sag Rods |
Cladding: |
Single Skin Sheeting Or Insulated Sandwich Panel As Specified |
Openings: |
Framed Openings To Door Window And Louver Schedule |
Design Basis: |
Wind Region Roof Load Seismic Crane And Mezzanine Load As Applicable |
Documents: |
3D Model GA And Erection Drawings Anchor Plan And Coating Report |
Erection: |
Bolted Site Assembly With Piece Marked Members |
Rafter Type: |
Web Truss Rafter With UB Or UC Chords And Welded Web Members |
Truss Depth: |
Set By Clear Span Roof Load And Available Headroom |
Web Member Pattern: |
Vertical And Diagonal Layout Set At Design Stage |
Chord Section: |
Hot Rolled UB Or UC Or Welded Built Up Where The Range Does Not Fit |
Splices: |
Located At Panel Points And Matched To Transport Length |
Column Section: |
Galvanized Universal Column UC Or Welded Built Up H Section |
Surface Treatment: |
Hot Dip Galvanized After Fabrication |
Galvanizing Standard: |
As Named In Project Specification With Coating Class Matched To Site |
Secondary Framing: |
Galvanized C Or Z Purlins And Girts With Bracing And Sag Rods |
Cladding: |
Single Skin Sheeting Or Insulated Sandwich Panel As Specified |
Openings: |
Framed Openings To Door Window And Louver Schedule |
Design Basis: |
Wind Region Roof Load Seismic Crane And Mezzanine Load As Applicable |
Documents: |
3D Model GA And Erection Drawings Anchor Plan And Coating Report |
Erection: |
Bolted Site Assembly With Piece Marked Members |
The roof member is the part that decides whether a large shed stays economical. A web truss rafter does the same job as a solid beam at a fraction of the steel in the middle, and it opens the depth of the roof structure into usable space for services.
A web truss rafter is a fabricated roof member with two chords and a connecting web. The top chord carries the roof, the bottom chord carries the tension, and welded vertical and diagonal web members hold the two chords at a fixed distance so the pair acts as one deep, stiff member.
The chords are cut from hot rolled universal beam UB or universal column UC profiles, so the material is a standard section rather than a special extrusion. The depth between the chords, the web member pattern and the panel spacing are all decided at design stage, which is why the same drawing set can serve a shed and a warehouse of very different spans.
| Aspect | Web truss rafter | Solid UB rafter |
|---|---|---|
| Steel in the member | Less steel in the middle of the span, because depth is built by geometry rather than by mass | Steel increases with span, so the deep end of the range gets heavy |
| Roof structure depth | Deeper overall, and that depth is open space rather than solid steel | Shallower overall, no usable zone inside the member |
| Services and lighting | Lighting, cable trays, sprinkler runs and ventilation sit between the chords | Services hang below the rafter soffit |
| Fabrication | Jig welded, more welding hours, geometry checked at trial assembly | Cut, drill and weld connections only |
| Transport and erection | Spliced at panel points for container length and bolted on site | One piece where transport allows, spliced when it does not |
| Best fit | Wide clear spans, warehouses with services overhead, sheds where weight matters | Short to moderate spans, simple roofs, fast programmes |
Table 1: the selection question we work through with you at enquiry stage. Neither option is better in general; the span and the roof use decide it.
The truss only performs if the frame below it is detailed to suit. Columns are galvanized universal column UC sections, with the web plane oriented so the knee connection lands on the column flange or on a welded end plate. Where the design calls for it, the column is a welded built up H section instead of a rolled profile.
A truss is only as good as its geometry. Chords are set in a jig, tacked, checked for depth and square, welded to a planned sequence to control distortion, then trial assembled against the mating member before marking. That sequence is what makes site bolting possible without site drilling or site straightening.
The truss is dipped as a finished assembly, after all welding, drilling and the trial fit are done. Because the chords are open profiles, the zinc reaches the inside faces and the web member roots without a closed cavity to trap air. Where a closed member is used anywhere in the frame, it is vented and drained as part of the detail.
![]()