Product Details
Place of Origin: Zhejiang, China
Brand Name: FAMOUS
Certification: ISO 9001
Model Number: Clear Span Truss Rafter Warehouse
Payment & Shipping Terms
Minimum Order Quantity: 1000
Price: USD 12-20/SQM
Packaging Details: Steel strapped bundles with edge protection, marked with profile, thickness and length, loaded in 20ft or 40ft container
Delivery Time: 15 to 25 days after drawing confirmation
Payment Terms: L/C,D/A,D/P,T/T
Supply Ability: 2,000 – 5,000 MT/month
Span Type: |
Clear Span With No Internal Column Line |
Clear Span: |
Set By Your Drawing And Confirmed Against Truss Depth And Deflection |
Rafter Type: |
Web Truss Rafter With UB Or UC Chords And Welded Web Members |
Truss Depth: |
Sized For Span Roof Load And Deflection Limit |
Column Section: |
Galvanized Universal Column UC Or Welded Built Up H Section |
Splices: |
Bolted Site Splices Set Around Transport And Bath Limits |
Surface Treatment: |
Hot Dip Galvanized After Fabrication |
Galvanizing Standard: |
As Named In Project Specification With Coating Class Matched To Site |
Secondary Framing: |
Galvanized C Or Z Purlins And Girts With Bracing And Sag Rods |
Cladding: |
Single Skin Sheeting Or Insulated Sandwich Panel As Specified |
Openings: |
Framed Openings To Door Window And Louver Schedule |
Design Basis: |
Wind Region Roof Load Deflection Limit Seismic And Crane Load As Applicable |
Documents: |
3D Model GA And Erection Drawings Anchor Plan And Coating Report |
Erection: |
Bolted Site Assembly With Temporary Bracing Shown On Drawings |
Span Type: |
Clear Span With No Internal Column Line |
Clear Span: |
Set By Your Drawing And Confirmed Against Truss Depth And Deflection |
Rafter Type: |
Web Truss Rafter With UB Or UC Chords And Welded Web Members |
Truss Depth: |
Sized For Span Roof Load And Deflection Limit |
Column Section: |
Galvanized Universal Column UC Or Welded Built Up H Section |
Splices: |
Bolted Site Splices Set Around Transport And Bath Limits |
Surface Treatment: |
Hot Dip Galvanized After Fabrication |
Galvanizing Standard: |
As Named In Project Specification With Coating Class Matched To Site |
Secondary Framing: |
Galvanized C Or Z Purlins And Girts With Bracing And Sag Rods |
Cladding: |
Single Skin Sheeting Or Insulated Sandwich Panel As Specified |
Openings: |
Framed Openings To Door Window And Louver Schedule |
Design Basis: |
Wind Region Roof Load Deflection Limit Seismic And Crane Load As Applicable |
Documents: |
3D Model GA And Erection Drawings Anchor Plan And Coating Report |
Erection: |
Bolted Site Assembly With Temporary Bracing Shown On Drawings |
A clear span shed has no column in the middle of the floor. Everything that would have been carried by that column has to be carried by the roof member instead, which is why the rafter on a clear span building is the member that gets designed hardest.
In a multi span building, an internal column line shares the roof load and keeps every rafter short. In a clear span building that line is gone, so the full roof load travels from the ridge to the column in one member, and the frame has to resist the bending and the deflection that comes with it.
That single decision changes the section sizes, the connection details, the base design and the transport plan. It is the first thing we confirm at enquiry stage, because a span that is comfortable as a multi span building becomes a different structural problem as a clear span.
| Decision Point | Clear span | With internal columns |
|---|---|---|
| Floor use | Unobstructed floor, so racking, machinery, vehicle movement and long goods are laid out without a column line to design around | Column line splits the floor and constrains racking, traffic lanes and layout changes |
| Roof member | One long rafter carries the whole span, so a web truss is usually the practical choice | Shorter rafters, solid sections often sufficient |
| Column and base | Fewer columns carrying more load each, with higher uplift at the base | More columns carrying less each, smaller bases |
| Deflection control | Governs the design, because the roof has to stay flat over the full span | Easier to control across a shorter span |
| Transport and erection | Long members must be spliced for container or road limits | Members ship in one piece more often |
| Future flexibility | Layout can change without touching the structure | Layout is tied to the column grid |
Table 1: what actually changes when the internal column line is removed. The trade is floor freedom against member size.
A clear span building also concentrates load at fewer points, so the columns get larger and the base plates get heavier. The column section is chosen for the truss reaction and the eave height together, not separately, and the base detail is designed for the uplift that a wide roof generates.
A clear span roof member is long by definition, and long members run into three physical limits: what fits in a container, what the galvanizing bath can take, and what the site crane can lift. We design around those limits instead of discovering them at shipment.
The frame is hot dip galvanized after fabrication, which for a clear span building means the long members are dipped as finished assemblies and the coating has to survive handling, transport and erection without site touch up.
![]()