Product Details
Place of Origin: Zhejiang, China
Brand Name: FAMOUS
Certification: ISO 9001
Model Number: Welded UB UC Warehouse Frame
Payment & Shipping Terms
Minimum Order Quantity: 1000
Price: USD 12-20/SQM
Packaging Details: Steel strapped bundles with edge protection, marked with profile, thickness and length, loaded in 20ft or 40ft container
Delivery Time: 15 to 25 days after drawing confirmation
Payment Terms: L/C,D/A,D/P,T/T
Supply Ability: 2,000 – 5,000 MT/month
Frame Type: |
Welded Shop Fabricated Portal Frame With UB And UC Members |
Column Section: |
Hot Rolled Universal Column UC Or Welded Built Up H Section |
Spanning Members: |
Hot Rolled Universal Beam UB Beams Tie Beams Gable And Crane Members |
Rafter Type: |
Web Truss Rafter With UB Or UC Chords And Welded Web Members |
Welding: |
Shop Welding To Specified Procedure With Qualified Welders |
Drilling: |
All Holes And Cleats Completed Before Galvanizing |
Surface Treatment: |
Hot Dip Galvanized After Fabrication |
Galvanizing Standard: |
As Named In Project Specification With Coating Class Matched To Site |
Secondary Framing: |
Galvanized C Or Z Purlins And Girts With Bracing And Sag Rods |
Openings: |
Framed Openings To Door Window And Louver Schedule |
Design Basis: |
Wind Region Roof Load Seismic Crane And Mezzanine Load As Applicable |
Documents: |
3D Model GA And Erection Drawings Anchor Setting Plan And Coating Report |
Packing: |
Bundled By Piece Mark And Loaded In Erection Sequence |
Erection: |
Bolted Site Assembly With Piece Marked Members |
Frame Type: |
Welded Shop Fabricated Portal Frame With UB And UC Members |
Column Section: |
Hot Rolled Universal Column UC Or Welded Built Up H Section |
Spanning Members: |
Hot Rolled Universal Beam UB Beams Tie Beams Gable And Crane Members |
Rafter Type: |
Web Truss Rafter With UB Or UC Chords And Welded Web Members |
Welding: |
Shop Welding To Specified Procedure With Qualified Welders |
Drilling: |
All Holes And Cleats Completed Before Galvanizing |
Surface Treatment: |
Hot Dip Galvanized After Fabrication |
Galvanizing Standard: |
As Named In Project Specification With Coating Class Matched To Site |
Secondary Framing: |
Galvanized C Or Z Purlins And Girts With Bracing And Sag Rods |
Openings: |
Framed Openings To Door Window And Louver Schedule |
Design Basis: |
Wind Region Roof Load Seismic Crane And Mezzanine Load As Applicable |
Documents: |
3D Model GA And Erection Drawings Anchor Setting Plan And Coating Report |
Packing: |
Bundled By Piece Mark And Loaded In Erection Sequence |
Erection: |
Bolted Site Assembly With Piece Marked Members |
A warehouse frame welded in the shop, drilled and finished before it is dipped, then galvanized as a complete member set: universal column UC verticals, universal beam UB spanning members and web truss rafters over the clear span.
Welded does not describe one joint. It describes how the frame is made. Splices, base plates, stiffeners, cleats, truss web members and any built up member are welded in the shop under controlled conditions, then drilled and finished, then galvanized. Site work is reduced to bolting.
The table below sets out how each part of the package is made, protected and checked. Every row in the last column is decided by your drawing or your specification.
| Component | Section Route | Welding And Connection | Drilling And Finish Order | Galvanizing And Protection | Inspection And Documents | Decided By Your Project |
|---|---|---|---|---|---|---|
| UC Columns | Hot rolled universal column UC, or welded built up H section where the load or height exceeds the rolled range | Base plate and cap plate welded with full penetration where the design requires it, stiffeners fillet welded, splice joints prepared for bolted site connection | All bolt holes, cleat positions and stiffener locations drilled and completed before dipping, so no bare steel is exposed after coating | Hot dip galvanized as a finished member, with vent and drain holes positioned so zinc enters and drains from every closed zone | Dimensional check against the erection drawing, weld visual inspection, mill test certificate per heat number, coating report per batch | Section size, orientation, fixed or pinned base, clear height, crane bracket positions |
| UB Beams And Tie Members | Hot rolled universal beam UB for roof beams, tie beams, gable members and lintels | End plates and cleats welded in the shop, bolted on site, with cope and notch details cut to clear the connecting member | Holes drilled to the connection drawing, edges dressed, member marked before galvanizing | Galvanized after fabrication, so cut edges and hole bores are protected rather than left as raw steel | Member mark check, hole position check, weld inspection, certificate and coating record | Span, load case, deflection limit, whether the member also carries a crane or a hanging load |
| Web Truss Rafters | Top and bottom chords in UB or UC, tied by welded vertical and diagonal web members | Chord to web member welds made in a jig to hold the truss geometry, splice positions set for transport length, purlin cleats welded to the top chord | Purlin cleat holes and brace holes drilled before dipping, with the truss trial assembled where the geometry is complex | Galvanized as a complete truss, with openings left in the web zone so the zinc flows through and no air pocket is trapped | Truss depth and camber check, weld inspection, piece mark and heat number on the chord, coating report | Truss depth, chord section, web member spacing and pattern, number of splices |
| Welded Built Up H Members | Plate cut and welded into an H section where a rolled profile does not fit the design | Web to flange welds run to the specified procedure, with weld size and penetration set by the design, ends squared for bearing | Holes and stiffeners completed after welding and before dipping, so the finished member needs no site drilling | Fully galvanized inside and out, with holes in the web for drainage and a vent at each closed end | Weld procedure and welder qualification on record, dimensional check, visual and requested non destructive inspection, coating report | Web depth, flange width and thickness, weld size, whether full penetration is specified |
| Bracing And Secondary | Angle, rod and C or Z sections for roof and wall bracing, purlins and girts | Gusset plates welded to the primary frame in the shop, bracing members bolted or tensioned on site | Holes and slotted connections drilled to allow site adjustment within the detail | Galvanized with the main frame, so the secondary system does not become the first item to rust | Layout checked against the bracing drawing, member marks, coating report | Bracing arrangement for your wind region, purlin spacing, cladding fixing centres |
| Base And Anchor Detail | Base plates with stiffeners, holding down bolts and template positions | Base plate welded to the column with the specified weld, bolt holes matched to the anchor setting plan | Setting plan issued before fabrication so the foundation can be poured to it | Base plate and the lower column zone galvanized, with the coating detail agreed for the embedment or grout zone | Anchor bolt setting plan, plate flatness check, coating report | Base fixity, anchor bolt size, grout allowance, plinth or slab detail |
| Openings And Interface | Framed openings for roller doors, access doors, windows and louvers, plus gutter and canopy brackets | Opening frames welded into the bay detail, with lintel and jamb members sized for the opening | Fixing holes for doors, flashings and brackets drilled before dipping | Galvanized with the frame, so the opening reveals and bracket faces are coated | Opening schedule check, member marks, coating report | Door sizes and positions, window schedule, canopy and gutter layout |
Table 1: how each component is made, protected and checked. Values in the last column are set per project, not from a catalogue.
Welding is the step that decides whether the coating works. Every weld, hole and cut edge has to exist before the member goes into the zinc, because anything added afterwards is bare steel in the most corrosion prone place. That is why the fabrication sequence is fixed: cut, weld, drill, straighten, inspect, dip.