Product Details
Place of Origin: China
Brand Name: FASEC
Certification: AISC 360 design, ISO 9001, EN 1090 class 2 available
Model Number: FASEC-WS-ECO
Payment & Shipping Terms
Minimum Order Quantity: 1 set / 200 square meters
Price: USD 18 - 35 per square meter
Packaging Details: Bundles with spacers, bolts in labelled crates, panels edge protected
Delivery Time: 20 to 30 days after drawing confirmation
Payment Terms: L/C,D/A,D/P,T/T
Supply Ability: 3000 tons per month
Primary Frame: |
Q235B Or Q355B H Section, Grade Fixed By Calculation |
Secondary Framing: |
Galvanized C And Z Purlins And Girts |
Structural Design: |
AISC 360 LRFD Base, Local Code Package On Request |
Build Levels: |
Basic, Standard And Extended Configurations |
Cladding: |
Light Metal Cladding Panel Or Single Skin With Optional Insulation |
Surface Protection: |
Shop Primer, Epoxy Primer Or Topcoat Per Service Period |
Structural Layout: |
Fully Customized Frame Type, Column Grid, Eave Height And Roof Pitch |
Crane Provision: |
Customized Crane Capacity And Runway Elevation |
Openings: |
Customized Door, Window, Louver And Skylight Schedule |
Drainage: |
Gutter And Downpipe Layout Coordinated With Cladding Module |
Erection: |
Bolted Assembly, Anchor Plan And Sequence Drawing Supplied |
Documentation: |
GA Drawing, Reactions, Anchor Plan, Packing List, Mill Certificates |
Primary Frame: |
Q235B Or Q355B H Section, Grade Fixed By Calculation |
Secondary Framing: |
Galvanized C And Z Purlins And Girts |
Structural Design: |
AISC 360 LRFD Base, Local Code Package On Request |
Build Levels: |
Basic, Standard And Extended Configurations |
Cladding: |
Light Metal Cladding Panel Or Single Skin With Optional Insulation |
Surface Protection: |
Shop Primer, Epoxy Primer Or Topcoat Per Service Period |
Structural Layout: |
Fully Customized Frame Type, Column Grid, Eave Height And Roof Pitch |
Crane Provision: |
Customized Crane Capacity And Runway Elevation |
Openings: |
Customized Door, Window, Louver And Skylight Schedule |
Drainage: |
Gutter And Downpipe Layout Coordinated With Cladding Module |
Erection: |
Bolted Assembly, Anchor Plan And Sequence Drawing Supplied |
Documentation: |
GA Drawing, Reactions, Anchor Plan, Packing List, Mill Certificates |
A workshop does not need to be expensive to be correct. This package keeps the engineering discipline of a proper steel building and removes only what the project can live without: over specified steel grades, excess accessory scope and cladding that costs more than the process requires. Frames use Q235B or Q355B sections selected by calculation and checked to AISC 360, secondary members follow a purlin grid that matches the panel module, and the whole envelope closes with light metal cladding. What follows is written as a working brief rather than a catalogue page: where the package fits, what each budget level buys, what sits inside the price, how long the stages take and how the route compares with a concrete alternative.
If three or more points in the left column match your project, this package is usually the economical answer.
![]()
Rather than one fixed offer, the package is quoted at three levels so the buyer can see what each step of money buys. All three share the same design standard and the same bolted connection philosophy. The difference sits in grade selection, envelope build up and accessory scope. At the Basic level the frame uses Q235B wherever calculation allows, the envelope is single skin sheet over purlins with a vapour barrier and liner, accessories are limited to a personnel door per accessible side and the steel leaves the works with a shop primer only, which suits dry storage and general shelter. The Standard level mixes Q235B and Q355B member by member, puts an insulated sandwich panel on the roof with sheet walls, adds doors, windows and gutters, and applies a two coat epoxy primer, which is the usual choice for assembly and light manufacturing. The Extended level moves the primary frame to Q355B, applies sandwich panel to both roof and wall, includes skylights and louvers, and finishes with primer plus topcoat, which is the right route where humidity, wash down or temperature stability affects the process.
![]()
Scope is stated in plain terms so two quotations can be compared on equal ground. The price includes the AISC 360 calculation package, general arrangement drawings, anchor bolt plans and erection sequence drawings, the primary frame with bracing, the secondary purlins and girts with sag rods, the roof and wall cladding for the level selected, gutters and downpipes cut to the agreed layout, anchor bolts and assembly bolts, match marking together with marked bundles, and the handover file with packing list, mill certificates and pre shipment photographs. Optional additions quoted separately are a local code adaptation of the calculations, a bilingual drawing set, crane brackets and runway beams, mezzanine framing, insulation upgrades, skylights and louvers, rolling or sectional doors, stainless fastener upgrades, third party inspection and site supervisor attendance. Items that stay on the buyer side are approval submission to local authorities, site setting out, fire protection coating where the authority requires it, site welding beyond the bolted scope, sealants and touch up paint, electrical and door automation, site drainage works, lifting equipment and erection crew, consumables and import clearance. Stating the three groups openly removes the usual argument about who supplies what.
Stage by StageThese durations are production side only and run partly in parallel. They are reissued as dated commitments once the drawing revision is frozen, so the buyer can plan foundation work against real dates instead of estimates.
![]()
| Item | Specification |
|---|---|
| Primary frame | Q235B or Q355B welded or hot rolled H section, grade fixed by calculation rather than by habit |
| Secondary framing | Galvanized C and Z purlins and girts, spacing set by the cladding module |
| Design standard | AISC 360 LRFD as base scope, local code package issued on request |
| Connection | Galvanized high strength bolts with match marked members, no field welding on the primary frame |
| Roof build up | Single skin with liner, light sandwich panel or insulated panel depending on level |
| Wall build up | Profiled sheet or light sandwich panel, color and profile chosen by the client |
| Surface system | Shop primer, epoxy primer or topcoat, selected against the target service period |
| Openings | Door, window, louver and skylight positions detailed on the approved drawing set |
| Design loads | Dead, live, wind uplift and snow action combined for the project location |
| Erection | Bolted assembly with anchor plan and erection sequence drawing supplied |
| Quality records | Mill certificates, dimensional audit, coating check and pre shipment photo report |
| Service life | Structural design life agreed with the client, with maintenance intervals set by coating class |
Buyers comparing a steel workshop with a concrete frame are usually comparing cash flow and flexibility rather than material price alone. A steel frame is fabricated off site while foundations are still being prepared, so the two work packages overlap instead of queueing, and the building closes weeks earlier. Because the structure is lighter, pad footings are smaller and less concrete goes into the ground, which often offsets part of the steel cost. Bolted joints mean a future bay can be added, removed or reconfigured, whereas a concrete frame usually needs a new structural joint and some demolition to grow. A steel building can also be dismantled and re erected when a lease ends, a point that matters to manufacturers who expect to move. The trade off is that steel needs a coating and fire protection design, where concrete is inherently fire resistant and does not corrode, so the comparison should be made over the whole life of the building rather than on the first invoice.
![]()
Structural customization covers frame type, span arrangement, bay spacing, eave height, roof pitch, bracing positions, crane brackets, mezzanine framing and the details needed for a future extension. Envelope customization covers cladding type, panel thickness, insulation level, sheet profile, color, skylight ratio, drainage layout and the complete opening schedule. Documentation customization covers drawing language, dimension units, calculation code, certificate scope and third party inspection. Where the buyer already owns a design, we work from that drawing and simply optimise sections and detailing for cost, keeping the architectural intent unchanged.
![]()
Yes, provided the extension node is planned now. We keep the bracing and frame layout compatible at the gable end and issue the connection details with the original set, so a future bay bolts on without cutting the existing frame.
Is Q235B strong enough, or should everything be Q355BGrade is decided per member by calculation. Q235B is usually sufficient for secondary members and shorter spans, while Q355B earns its cost on long spans, crane bays and heavy snow zones. Mixing grades inside one frame is normal and keeps tonnage down.
Can the building be shipped in standard containersYes. Members are detailed to fit container length and bundles are packed by erection zone, so the receiving crew unloads in the order the frame goes up. The container plan is issued before loading and travels with the shipping documents.
What if the local crew has never erected a steel frameEvery order carries match marked members, an anchor bolt plan and an erection sequence drawing. Site supervisor attendance can be quoted, and remote support by video is included during the first days of erection.
Can the cladding be upgraded later without replacing the frameUsually yes. Purlin spacing is set at design stage to accept both sheet and sandwich panel, so an upgrade later means replacing the envelope only. Tell us at quotation stage if an upgrade is already expected and the purlin grid will be set for the heavier panel.
Where This Fits in PracticeTypical installations include general manufacturing workshops, assembly halls, packaging plants, storage and distribution warehouses, agricultural equipment stores, maintenance depots and light production buildings that will be extended in phases. Dry storage usually stops at the Basic level, general assembly sits at Standard, and workshops with humidity, wash down or temperature sensitive processes move to Extended. Because the frame is bolted and match marked, the same structure can be dismantled and re erected when a lease ends, which often decides the investment for a growing manufacturer.
Packing and HandoverMembers are match marked, bundled by erection zone and strapped with spacers between layers so coated surfaces arrive undamaged. Bolts, nuts, washers, anchor rods and small fittings go into labelled crates by drawing number, while cladding panels are edge protected and stacked on timber bearers. Each shipment carries a bundle list, a container loading plan and a photo report taken before the doors close. A twelve month fabrication warranty covers material and workmanship, and a maintenance guide with inspection intervals is supplied for the coating system chosen.
![]()