Product Details
Place of Origin: China
Brand Name: FASEC
Certification: CE EN 1090, ISO 9001, AISC 360 design
Model Number: FASEC-WS-GALV
Payment & Shipping Terms
Minimum Order Quantity: 1 set / 200 square meters
Price: USD 30 - 65 per square meter
Packaging Details: Bundles with coating protection spacers, bolts in labelled crates, panels edge protected
Delivery Time: 30 to 40 days after drawing confirmation
Payment Terms: L/C,D/A,D/P,T/T
Supply Ability: 3000 tons per month
Primary Frame: |
Hot Dip Galvanized H Section After Fabrication, Grade Per Project Code |
Secondary Framing: |
ASTM A653 Zinc Coated C And Z Girts And Purlins |
Zinc Coating: |
Coating Class Customized To Inland, Industrial Or Coastal Exposure |
Surface System: |
Galvanized Only Or Duplex Primer Plus Topcoat |
Structural Design: |
AISC 360 LRFD Base, EN 1993 Or Local Code Package On Request |
Execution Standard: |
CE EN 1090 EXC2 Welding And Inspection, ISO 9001 System |
Structural Layout: |
Fully Customized Frame Type, Column Grid, Eave Height And Roof Pitch |
Crane Provision: |
Customized Crane Capacity And Runway Elevation Per Lifting Duty |
Roof And Wall: |
Customized Sandwich Panel Or Single Skin With Climate Matched Insulation |
Openings: |
Customized Door, Window, Louver And Skylight Schedule |
Ancillary Steel: |
Customized Mezzanine, Stair, Platform And Canopy Framing |
Traceability: |
Member Mark, Heat Number And Coating Batch Linked To Each Bundle |
Primary Frame: |
Hot Dip Galvanized H Section After Fabrication, Grade Per Project Code |
Secondary Framing: |
ASTM A653 Zinc Coated C And Z Girts And Purlins |
Zinc Coating: |
Coating Class Customized To Inland, Industrial Or Coastal Exposure |
Surface System: |
Galvanized Only Or Duplex Primer Plus Topcoat |
Structural Design: |
AISC 360 LRFD Base, EN 1993 Or Local Code Package On Request |
Execution Standard: |
CE EN 1090 EXC2 Welding And Inspection, ISO 9001 System |
Structural Layout: |
Fully Customized Frame Type, Column Grid, Eave Height And Roof Pitch |
Crane Provision: |
Customized Crane Capacity And Runway Elevation Per Lifting Duty |
Roof And Wall: |
Customized Sandwich Panel Or Single Skin With Climate Matched Insulation |
Openings: |
Customized Door, Window, Louver And Skylight Schedule |
Ancillary Steel: |
Customized Mezzanine, Stair, Platform And Canopy Framing |
Traceability: |
Member Mark, Heat Number And Coating Batch Linked To Each Bundle |
This workshop system is built around one idea: the steel should outlast the environment it stands in. Primary frames, secondary girts and purlins are hot dip galvanized to the coating class agreed with the buyer, and the secondary framing follows ASTM A653 zinc coated steel so the whole structure behaves as one corrosion resistant assembly. Frame design is verified to AISC 360 and fabrication follows CE EN 1090 execution class 2, which means the same package can be submitted for a coastal warehouse in Southeast Asia or a humid production hall in Europe without redesigning the connection philosophy. Because galvanizing is planned at the detailing stage, vent holes, drainage paths and double dip lengths are set before material is cut, so distortion and bare spots are controlled instead of corrected on site.
Seven reasons the galvanized route suits humid and salt loaded sites.
Key engineering items, with all dimensions fixed by project design.
| Item | Specification |
|---|---|
| Primary Frame | Hot rolled or welded H section, galvanized after fabrication, steel grade selected per project code |
| Secondary Framing | ASTM A653 zinc coated C and Z sections for girts and purlins, coating class to site environment |
| Zinc Coating | Coating mass and thickness agreed per exposure category, verified by coating mass test or magnetic gauge |
| Structural Design | AISC 360 LRFD base scope, with EN 1993 or local code package issued on request |
| Fabrication and Execution | CE EN 1090 execution class 2 welding, inspection and traceability, ISO 9001 quality system |
| Connection Type | Galvanized high strength bolted connections with match marked members, primary frame free of field welding |
| Surface System | Hot dip galvanizing alone, or duplex system with compatible primer and topcoat for color and chemical resistance |
| Roof Build Up | Insulated sandwich panel, single skin sheet or composite deck, selected to climate and fire requirement |
| Wall Build Up | Sandwich panel, profiled sheet or curtain wall infill, with color and profile matched to client brand |
| Openings and Accessories | Rolling doors, sectional doors, personnel doors, windows, louvers, skylights, gutters and flashing detailed with the frame |
| Design Loads | Dead, live, wind uplift, snow and seismic action combined for the project location and governing code |
| Ancillary Steel | Mezzanine, stair, platform, canopy and crane brackets galvanized in the same batch for coating consistency |
| Traceability | Member mark, heat number, coating batch and inspection record linked to each shipping bundle |
Coating is chosen from the site rather than from habit. For inland workshops with normal humidity, a standard galvanized finish on the primary frame with A653 zinc coated girts is usually sufficient and keeps the budget focused on structure. For coastal sites, salt spray exposure and prevailing wind direction decide whether coating mass should be increased, whether a sealer is applied, and whether stainless or coated fasteners are specified. For chemical plants, fertilizer stores and food processing areas, the duplex system is preferred because the organic topcoat shields the zinc from acids and cleaning agents while the zinc protects the steel wherever the paint film is scratched. For cold rooms and wash down areas, detailing matters as much as coating thickness, so drainage holes, joint sealing and the interface between panel and steel are resolved on the drawing before galvanizing.
![]()
Coating quality is decided long before the dipping kettle. Our detailing team adds vent and drain holes to every closed section, sets the overlap direction so molten zinc can escape, and marks double dip members where kettle length is shorter than the member. After dipping, coating mass is checked on a sampling plan, coating thickness is scanned at defined points, and any repair area is treated with a zinc rich compound and recorded. Threaded parts are either spun to clear the threads or protected during dipping, so bolts and anchor rods fit on site without re tapping. Members are then match marked, and the coating batch number is written into the packing list so a future inspection can trace the exact production lot.
What Can Be CustomizedBuyers can adjust the structural side, the envelope side and the documentation side independently. On the structural side, the frame type can move between portal frame, truss frame and box column systems, girt spacing can follow the panel module, and crane brackets, mezzanine framing and future extension nodes can be prepared at the first order instead of being retrofitted. On the envelope side, panel thickness, core material, sheet profile, color and the full opening schedule are all set by the buyer, with trims and flashing drawn to suit. On the documentation side, drawing language, dimension units, calculation code, certificate scope and third party inspection can be arranged so the delivered file package matches what the client engineer, insurer or local authority expects to receive.
ApplicationsThe galvanized workshop suits coastal manufacturing plants, port side logistics sheds, fertilizer and chemical storage halls, food processing buildings with wash down routines, water treatment workshops, cold forming lines and equipment assembly bays. Because the frame carries crane runways and the coating tolerates humid air, the same system is used for maintenance depots and marine service buildings where repainting access is difficult. Open bay planning allows conveyors, machine foundations and mezzanine platforms to be introduced later without disturbing the primary steel, and office or laboratory corners can be enclosed inside the same envelope when a controlled environment is needed.
Engineering and DocumentationEvery quotation is supported by a preliminary scheme that shows the frame layout, girt arrangement, coating class assumption and cladding build up, so the buyer can compare options before committing. Approved projects receive general arrangement drawings, foundation reaction tables, anchor bolt plans, galvanizing instructions, erection sequence drawings and a packing list keyed to member marks. Third party inspection can be arranged for welding, dimensional check and coating thickness measurement, and the resulting reports are compiled with mill certificates, welding procedure specifications and coating batch records into a single handover package.
Packaging & Quality AssuranceGalvanized members are bundled by erection zone with timber or rubber spacers between layers to protect the coating during transport, then secured with strapping. Bolts, nuts, washers, anchor rods and small fittings are packed in labelled crates by drawing number. Panels and flashings are edge protected and stacked on bearers, with corner guards fitted to long trims. Before shipment the bundle list is checked against the packing plan, photographs of each bundle are recorded, and a container loading plan is issued so the receiving crew can unload in erection order. A twelve month fabrication warranty covers material and workmanship, and a maintenance guide is supplied with recommended inspection intervals for the coating class delivered.
![]()