logo
FAMOUS Steel Engineering Company
products
products
Home > products > Composite Floor Deck > Unpropping Metal Floor Deck System ComFlor 210 Alternative Fast Installation Roll Formed

Unpropping Metal Floor Deck System ComFlor 210 Alternative Fast Installation Roll Formed

Product Details

Place of Origin: China

Brand Name: FAMOUS

Certification: AS1397, EN 10346

Model Number: ComFlor 210 Alternative System

Payment & Shipping Terms

Minimum Order Quantity: 500 square meters

Price: Quoted per project drawing and quantity

Packaging Details: Strapping bundles with lifting marks, accessories in same shipment, loaded in 20 ft or 40 ft container

Delivery Time: Confirmed at order against the drawing release

Payment Terms: L/C,D/A,T/T,D/P

Supply Ability: Confirmed per production schedule

Get Best Price
Highlight:

unpropping metal floor deck

,

comflor 210 alternative system

,

roll formed steel decking

Steel Grade:
S280GD To S350GD, G500 On Request
Zinc Coating:
Z100 To Z275 Selected For Site Exposure
Standard:
AS1397, EN 10346
Unpropped Span:
Per Manufacturer Span Table
System Accessories:
End Closure, Side Lap Screw, Edge Trim, Pour Stop, Shear Stud
Customization:
Cut Length, Thickness, Coating Class, Bundle Marks, Packing Marks
Application:
Multi Storey Floor, Warehouse Floor, Mezzanine Platform
Steel Grade:
S280GD To S350GD, G500 On Request
Zinc Coating:
Z100 To Z275 Selected For Site Exposure
Standard:
AS1397, EN 10346
Unpropped Span:
Per Manufacturer Span Table
System Accessories:
End Closure, Side Lap Screw, Edge Trim, Pour Stop, Shear Stud
Customization:
Cut Length, Thickness, Coating Class, Bundle Marks, Packing Marks
Application:
Multi Storey Floor, Warehouse Floor, Mezzanine Platform
Unpropping Metal Floor Deck System ComFlor 210 Alternative Fast Installation Roll Formed
Unpropping Metal Floor Deck System ComFlor 210 Alternative Fast Installation Roll Formed Propping free metal floor deck system, 210 mm rib, 600 mm cover width, roll formed to length with matched accessories
Overview

This metal floor deck system is supplied as a propping free alternative to the ComFlor 210 deck. The sheet is roll formed from zinc coated high tensile strip with a 210 mm rib, then cut to the required bay length so it can be lifted from the bundle and laid directly on the beams.

The system is quoted as a package rather than as loose sheets. Deck, end closures, side lap screws, edge trim, pour stops and shear studs are all specified against the same layout drawing, so the installation crew is not chasing missing parts on the day of the pour. That is what keeps the installation fast on a repetitive floor.

Unpropping Metal Floor Deck System ComFlor 210 Alternative Fast Installation Roll Formed

System Components
Component Function Supply
Deck sheet Permanent formwork and tensile reinforcement for the composite slab Roll formed, cut to bay length, strapped in bundles
End closure Closes the rib ends and stops concrete leaking at the bearings Pressed steel, matched to the profile
Side lap screw Fixes sheet to sheet at the lap so the deck works as one plane Self drilling screws, centres set by the span table
Shear stud Transfers horizontal shear between steel beam and concrete slab Welded through deck, diameter to design
Edge trim Forms the slab edge and holds the concrete line Galvanized angle or channel
Pour stop Holds concrete at openings and construction joints Folded galvanized strip
Lifting clutch Lifts bundles without deforming the sheets Supplied or hired on request
Fast Installation Workflow
  1. Layout drawing is checked against the beam grid and the bundle sequence is planned per floor, so each bundle lands where it will be laid
  2. Bundles are lifted with a clutch and placed on the beams in the pour sequence, never stacked on unsupported sheets
  3. Sheets are laid rib down across the beams, working away from the lifting point so no one stands on an unlasped sheet
  4. Side laps are screwed as soon as a run is laid, which turns single sheets into a working platform
  5. End closures are fitted at each bearing and edge trim is fixed along the slab perimeter
  6. Shear studs are welded through the deck where composite action is required, with the deck earthed for the welding set
  7. Reinforcement, services, pour stops and temporary edge protection are installed on the completed deck
  8. Concrete is poured in the agreed sequence, with the deck checked for local damage before and during the pour

With the sheets cut to length and the accessories arriving in the same shipment, the site operation reduces to laying, screwing and fixing. That is where the programme saving comes from on a repetitive floor.

Unpropping Metal Floor Deck System ComFlor 210 Alternative Fast Installation Roll Formed

What Unpropping Means

Unpropping means the deck carries the wet concrete and construction load between beams without temporary props underneath. The deep rib provides the stiffness, so the prop inventory, the double handling between floors and the work at height to strike props are removed from the programme. The floor below also stays clear while the slab above is poured.

Unpropping is not automatic for every layout. Where the span, slab depth or pour sequence sits outside the manufacturer span table, the same sheet is used with props, so one profile still serves the whole building. The span table issued with the quotation states which bays can be poured without props.

Item Propped sequence Unpropped sequence
Temporary props Required under the deck None
Prop labour Install, maintain and strike None
Access below the slab Blocked until props are struck Clear throughout
Lay down sequence Interrupted by prop positions Continuous run across the bay
Structural zone Shallower slab possible Slightly deeper slab
Customization
  • Sheet length cut to the bay, so long runs are supplied as one piece and site cutting is kept to openings only
  • Base metal thickness selected for the span and loading of each floor, with a heavier gauge used only where the design needs it
  • Steel grade and zinc coating class chosen for the project location and the time the deck stays exposed
  • Accessories scoped against the drawing: end closures, side lap screws, edge trim, pour stops and shear studs
  • Bundle marks and delivery sequence set to the floor and grid reference, so bundles can be lifted in the order they are laid
  • Packing marks, shipping marks and label language set to the buyer requirement
  • Alternative profile options and matched tooling reviewed with the factory before the order is released

Unpropping Metal Floor Deck System ComFlor 210 Alternative Fast Installation Roll Formed

Technical Data
Item Specification
Profile type Metal floor deck system, ComFlor 210 alternative envelope
Rib height 210 mm
Cover width 600 mm
Base metal thickness 0.9 mm to 1.5 mm, selected per floor design
Sheet length Cut to the bay length, up to 12 m
Steel grade S280GD to S350GD, G500 on request
Zinc coating Z100 to Z275, selected for the site exposure
Standard AS1397, EN 10346
Unpropped span Set by the manufacturer span table for the sheet thickness, slab depth and pour sequence
Tolerances To normal roll forming tolerance, gauged at the start of each production run
Concrete Normal weight concrete, slab depth set by the structural design
Compatibility With ComFlor 210
Parameter ComFlor 210 This System
Rib height 210 mm 210 mm
Cover width 600 mm 600 mm
Sheet function Permanent formwork for composite slab Permanent formwork for composite slab
Site fixing Side lap screw, end closure, shear stud Side lap screw, end closure, shear stud
Accessories Profile matched range Profile matched range supplied with the deck
Load tables Published by the profile owner Manufacturer tables issued with the quotation

Compatibility is dimensional, so the system fits the same deck zone and fixing sequence as the ComFlor 210 profile. Span tables are not interchangeable, and the structural engineer confirms the slab design and load table for each project.

Typical Applications
  • Multi storey steel frame floors built on a fast, repetitive cycle
  • Warehouse and distribution floors where access below must stay open during the pour
  • Mezzanine and plant platforms inside operating buildings
  • Projects where prop hire and prop labour are a significant cost line
  • Floors with a tight programme where the deck is also the working platform
Packing and Delivery
Item Detail
Bundle Sheets strapped in bundles with lifting points marked, accessories in the same shipment
Moisture protection Bundles kept dry, ventilated and clear of the ground in transit and storage
Marking Label with sheet length, thickness, coating class, quantity and floor reference
Loading 20 ft and 40 ft container, flat rack for long sheets
Delivery Shipped in the installation sequence for each floor

Unpropping Metal Floor Deck System ComFlor 210 Alternative Fast Installation Roll Formed

Information Needed For A Quotation
  • Beam grid drawing with deck bearing lines and the intended pour sequence
  • Sheet thickness, slab depth and design imposed load
  • Zinc coating class, steel grade and any project standard to be met
  • Accessories scope: end closures, side lap screws, edge trim, pour stops, shear studs
  • Delivery port and required date per floor

Send these details and we will return the deck quantity, accessory list, span tables, bundle plan and a propped versus unpropped comparison for the project. Custom lengths, alternative coating classes and matched accessories are available on request.