logo
FAMOUS Steel Engineering Company
products
products
Home > products > Composite Floor Deck > Mezzanine Floor Slab Decking ComFlor 210 Compatible Ribbed Steel Profile Formwork

Mezzanine Floor Slab Decking ComFlor 210 Compatible Ribbed Steel Profile Formwork

Product Details

Place of Origin: China

Brand Name: FAMOUS

Certification: AS1397, EN 10346

Model Number: ComFlor 210 Compatible Ribbed Profile

Payment & Shipping Terms

Minimum Order Quantity: 500 square meters

Price: Quoted per project drawing and quantity

Packaging Details: Strapping bundles with lifting marks, loaded in 20 ft or 40 ft container

Delivery Time: 15 to 25 days after drawing confirmation

Payment Terms: L/C,D/A,D/P,T/T

Supply Ability: 20000 square meters per month

Get Best Price
Highlight:

mezzanine floor deck

,

comflor 210 compatible deck

,

ribbed steel profile formwork

Rib Height:
210 Mm
Cover Width:
600 Mm
Base Metal Thickness:
0.9 Mm To 1.5 Mm
Sheet Length:
1 M To 12 M Cut To Length
Steel Grade:
S280GD To S350GD, G500 Optional
Zinc Coating:
Z100 To Z275
Standard:
AS1397, EN 10346
Unpropped Span:
Up To 6 M
Mezzanine Loading:
Design Live Load From 2.5 KN Per Square Meter, Engineer Confirmed
Application:
Warehouse Mezzanine, Office Mezzanine, Plant Platform
Accessories:
End Closure, Side Lap Screw, Shear Stud, Edge Trim
Rib Height:
210 Mm
Cover Width:
600 Mm
Base Metal Thickness:
0.9 Mm To 1.5 Mm
Sheet Length:
1 M To 12 M Cut To Length
Steel Grade:
S280GD To S350GD, G500 Optional
Zinc Coating:
Z100 To Z275
Standard:
AS1397, EN 10346
Unpropped Span:
Up To 6 M
Mezzanine Loading:
Design Live Load From 2.5 KN Per Square Meter, Engineer Confirmed
Application:
Warehouse Mezzanine, Office Mezzanine, Plant Platform
Accessories:
End Closure, Side Lap Screw, Shear Stud, Edge Trim
Mezzanine Floor Slab Decking ComFlor 210 Compatible Ribbed Steel Profile Formwork
Mezzanine Floor Slab Decking ComFlor 210 Compatible Ribbed Steel Profile Formwork Ribbed steel profile formwork for mezzanine slabs, 210 mm rib, 600 mm cover width, propping free installation Overview

This ribbed steel profile is supplied as permanent formwork for mezzanine floor slabs and is compatible with the ComFlor 210 deck profile. Sheets are laid across the mezzanine beams, fixed at the side laps and ends, then filled with reinforced concrete to form a composite mezzanine slab.

The 210 mm rib depth gives the sheet enough stiffness to span between mezzanine beams without temporary props in typical layouts. For a mezzanine built inside a working warehouse or factory this matters most, because the floor below stays clear and the operation keeps running during the build.

Why It Suits Mezzanine Floors
  • Propping free sequence keeps the ground floor clear, so racking, production and access below are not blocked
  • Sheets arrive cut to length and are lifted straight into position, which shortens the mezzanine programme
  • The fixed deck becomes a safe working platform for the reinforcement and concrete trades before the pour
  • Ribbed profile gives a clean soffit line that can be left exposed or painted as the finished ceiling
  • Composite action with the concrete slab raises load capacity for storage and office use without extra steel depth
  • Mezzanine steel weight drops because the deck carries the wet concrete between the secondary beams
  • Compatible with standard side lap screws, end closures, edge trim and shear studs already used on site

Typical Mezzanine Build Up
  1. Mezzanine beams are erected and the deck bearing lines are checked against the layout drawing
  2. Sheets are lifted in bundles and laid in the planned sequence across the beams
  3. Side laps are screwed and end closures are fitted at each sheet end
  4. Edge trim is fixed, then shear studs are welded through the deck where composite action is required
  5. Reinforcement and services are installed with the deck acting as the working platform
  6. Concrete is poured and levelled, then cured before the mezzanine is loaded
  7. Finishes, edge protection and the final floor surface are applied
Typical Applications
  • Storage and picking mezzanines inside operating warehouses
  • Office and staff welfare mezzanines above factory floors
  • Plant platforms for air handling, compressors and switch rooms
  • Retail and showroom mezzanines where the soffit stays visible
  • Mezzanine extensions and refurbishment floors inside existing buildings
Packing and Delivery
Item Detail
Bundle Sheets strapped in bundles with lifting points marked
Bundle weight Set to the site crane limit on request
Marking Label with sheet length, thickness, quantity and mezzanine level reference
Loading 20 ft and 40 ft container, flat rack for long sheets
Delivery Cut to length and shipped in the installation sequence
Information Needed For A Quotation
  • Mezzanine layout drawing with beam spacing and deck bearing lines
  • Required live load and slab depth
  • Sheet thickness and zinc coating preference
  • Edge details, openings and stair trimming
  • Delivery port and required date

Send these details and we will return the deck quantity, accessory list, load span tables and packing plan for the project. Custom cut lengths, alternative zinc coatings and matched accessories are available on request.

Mezzanine Floor Slab Decking ComFlor 210 Compatible Ribbed Steel Profile Formwork