Product Details
Place of Origin: Hangzhou, China
Brand Name: FAMOUS
Certification: ISO 9001:2015, EN 1090-2, EN 10204 3.1
Model Number: Trial Batch H Beam Column
Payment & Shipping Terms
Minimum Order Quantity: 1000 Tons
Price: USD 620-880 / Ton
Packaging Details: Bundles strapped by member mark, end protection and corner guards, seaworthy export packing with loading plan
Delivery Time: 15-25 days after drawing approval for the trial batch
Payment Terms: T/T,L/C at sight,Western Union,Trade Assurance
Supply Ability: 3000 Tons per Month
Trial Batch Scope: |
First Batch Defined With The Client And Shipped Before The Balance Of The Order |
Drawing Revision: |
Revisions Accepted Free Of Charge Before Cutting Starts |
First Piece Approval: |
Photo And Measurement Record Of The First Members For Written Approval |
Cutting Service: |
CNC Plasma And Band Saw Cutting To The Approved Cut List |
Welded Section: |
Built Up H Sections, Plate Girders And Stiffened Columns To Drawing |
Material Grade: |
Q235B, Q355B, S275JR, S355JR, ASTM A36 As Specified |
Surface Treatment: |
Shot Blasting, Primer And Topcoat System, Or Hot Dip Galvanizing Per Specification |
Fabrication Standard: |
EN 1090-2 Or AISC 303, According To Project Requirement |
Inspection Support: |
Third Party Inspection Welcomed At Any Stage Of The Trial Batch |
Marking And Packing: |
Member Mark And Erection Sequence Number, Bundle Per Packing List |
Trial Batch Scope: |
First Batch Defined With The Client And Shipped Before The Balance Of The Order |
Drawing Revision: |
Revisions Accepted Free Of Charge Before Cutting Starts |
First Piece Approval: |
Photo And Measurement Record Of The First Members For Written Approval |
Cutting Service: |
CNC Plasma And Band Saw Cutting To The Approved Cut List |
Welded Section: |
Built Up H Sections, Plate Girders And Stiffened Columns To Drawing |
Material Grade: |
Q235B, Q355B, S275JR, S355JR, ASTM A36 As Specified |
Surface Treatment: |
Shot Blasting, Primer And Topcoat System, Or Hot Dip Galvanizing Per Specification |
Fabrication Standard: |
EN 1090-2 Or AISC 303, According To Project Requirement |
Inspection Support: |
Third Party Inspection Welcomed At Any Stage Of The Trial Batch |
Marking And Packing: |
Member Mark And Erection Sequence Number, Bundle Per Packing List |
Start with one trial batch, approve it, then place the full order
A first order should not be a gamble. We treat the opening batch as a trial: the drawing is checked with you, the first members are photographed and approved before the rest of the batch is welded, and the trial batch is shipped on its own schedule. Once you have seen the steel, the standard, the packing and the paperwork on your own site, the repeat order follows the same route with none of the unknowns.
The trial batch is a real production run, not a sample box. It is built on our own mill with the same drawings, the same welders and the same inspection as a full project order, so what you approve is what you will receive.
| Step | What We Do | What You Approve |
|---|---|---|
| Enquiry | Drawing set or member schedule reviewed by our engineers | Scope, grade and surface requirement confirmed |
| Quotation | Mill direct price breakdown: material, cutting, welding, surface, packing | Price and delivery schedule |
| Drawing check | Shop drawings issued with holes, copes and connections resolved | Drawing approval before cutting starts |
| Trial production | First members cut, welded and finished on the production line | Photo and measurement record of the first pieces |
| Inspection | Dimensional check, weld inspection and coating thickness recorded | Inspection report, third party visit if required |
| Shipment | Bundles packed by member mark, loading plan issued | Packing list and container photos |
| Review | Trial batch reviewed on site with your erection team | Decision to release the balance or adjust |
The trial batch is fabricated to your drawing, not adapted from a stock item, so the approval you give is valid for the full order.
We roll, cut, weld, blast and finish in our own workshops, with 1,200 to 1,300 staff and annual output of USD 500 to 600 million. Because there is no trading layer, the quotation you receive is built from material, processing, surface, packing and freight only, and it stays valid for the trial and for the repeat order that follows.
Send one drawing and our engineering team replies within 12 working hours with a mill direct quotation, a proposed trial schedule and the inspection plan that goes with it.