logo
FAMOUS Steel Engineering Company
products
products
Home > products > Structural Steel Fabrications > Corrosion-Resistant Corten Steel Truss Bridge for Prefabricated Lakeside Crossing

Corrosion-Resistant Corten Steel Truss Bridge for Prefabricated Lakeside Crossing

Product Details

Place of Origin: Zhejiang, China

Brand Name: FAMOUS

Certification: ISO 9001, EN 1090 EXC3, AWS D1.5

Model Number: Custom Design

Payment & Shipping Terms

Minimum Order Quantity: 1 Set

Price: USD 1,200-1,800 per Ton (FOB, project dependent)

Packaging Details: Modules bundled and steel-frame crated, coated surfaces protected, QR-coded member index supplied

Delivery Time: 35-50 days after drawing approval

Payment Terms: L/C,D/A,D/P,T/T

Supply Ability: 500 Tons per Month

Get Best Price
Highlight:

Zoned Corrosion Protection Design

,

Corten Lakeside Truss Crossing

,

Duplex Coated Splash Zone Steel

Steel Grade:
ASTM A588/A588M Gr.B Weathering Steel, Min Yield 345 MPa
Corrosion Strategy:
Zoned Protection: Bare Above Deck, Galvanized Or Duplex Splash Zone, Coated Below Deck
Coating System:
ISO 12944 C4-C5, Thermal Metal Spray Or Duplex Galvanized Plus Paint
Design Standard:
AASHTO LRFD, EN 1993-2 Or Client Specification
Structural System:
Through-truss, Pony Truss Or Deck-truss Plate Construction
Deck Options:
Steel Plate, Precast Concrete Panels Or Timber Deck
Drainage:
Closed Pipe Collection With Silt Traps, Controlled Outfall, Min 1.5% Deck Slope
Erection Methods:
Bank Crane Lifting, Barge-mounted Crane Or Launching With Nose Girder
Environment:
Freshwater Lakeside Exposure With Wet-dry Cycling And Splash Zone
Surface Finish:
Bare Weathering Steel, HDG, Metal Spray Or ISO 12944 Paint Per Zone
Bridge Geometry:
Fully Custom, Engineered To Project Drawings And Site Survey
Trial Assembly:
Full Or Matched-segment Trial Assembly With Camber Verification
Application:
Lakeside Pedestrian, Cycle, Light Vehicle And Landscape Crossings
Steel Grade:
ASTM A588/A588M Gr.B Weathering Steel, Min Yield 345 MPa
Corrosion Strategy:
Zoned Protection: Bare Above Deck, Galvanized Or Duplex Splash Zone, Coated Below Deck
Coating System:
ISO 12944 C4-C5, Thermal Metal Spray Or Duplex Galvanized Plus Paint
Design Standard:
AASHTO LRFD, EN 1993-2 Or Client Specification
Structural System:
Through-truss, Pony Truss Or Deck-truss Plate Construction
Deck Options:
Steel Plate, Precast Concrete Panels Or Timber Deck
Drainage:
Closed Pipe Collection With Silt Traps, Controlled Outfall, Min 1.5% Deck Slope
Erection Methods:
Bank Crane Lifting, Barge-mounted Crane Or Launching With Nose Girder
Environment:
Freshwater Lakeside Exposure With Wet-dry Cycling And Splash Zone
Surface Finish:
Bare Weathering Steel, HDG, Metal Spray Or ISO 12944 Paint Per Zone
Bridge Geometry:
Fully Custom, Engineered To Project Drawings And Site Survey
Trial Assembly:
Full Or Matched-segment Trial Assembly With Camber Verification
Application:
Lakeside Pedestrian, Cycle, Light Vehicle And Landscape Crossings
Corrosion-Resistant Corten Steel Truss Bridge for Prefabricated Lakeside Crossing
Corrosion-Resistant Corten Steel Truss Bridge for Prefabricated Lakeside Crossing

A lakeside crossing is a wet-dry cycling environment, not a dry inland one. Bare weathering steel performs well where the surface dries out regularly, but it does not self-protect where water sits, where splash repeatedly wets the steel, or where silt and vegetation hold moisture against the surface. This bridge is therefore not designed as one corrosion environment: the span is divided into exposure zones, and each zone receives the protection system that actually works there.

Corrosion-Resistant Corten Steel Truss Bridge for Prefabricated Lakeside Crossing

Zoned Protection Strategy
Zone A — above deck Freely ventilated bare ASTM A588 weathering steel, surface allowed to dry and form its stable patina
Zone B — splash band Hot-dip galvanizing, thermal metal spray or a duplex system; bare weathering steel is not used where repeated wetting is unavoidable
Zone C — below deck Damp and shaded surfaces receive metal spray or high-build epoxy-polyurethane to ISO 12944 C4/C5, with crevices sealed or eliminated
Zone D — embedded or immersed Increased corrosion allowance, concrete encasement or sleeved piles, with optional cathodic protection and reference electrodes
Hardware Stainless or hot-dip galvanized bolting in splash zones, weathering bolts only in Zone A
Material Specification
  • Main members: ASTM A588/A588M Gr.B weathering steel, min. yield 345 MPa, tensile 485 MPa, corrosion index ≥ 6.0 per ASTM G101
  • Cold climate option: ASTM A709 Gr.50 with Charpy V-notch toughness to Zone 2 or Zone 3
  • Abrasion or immersion proximity: higher-strength plate with thickness allowance calculated for the design life
  • Coatings: ISO 12944 C4–C5 systems, zinc silicate primer or thermal spray with sealed topcoat, duplex galvanized plus paint in the splash zone
  • Separation: stainless to weathering steel contact broken by isolating washers, steel isolated from concrete and timber
Detailing Rules for Wet Exposure
  • No horizontal surfaces that can pond; every flange, gusset and splice oriented to shed water
  • Drip edges and weep paths at every low point, with discharge kept away from lower members
  • Crevices eliminated at built-up members and stiffener-to-web junctions, or seal-welded continuously
  • Vented connections and open details so air can move through and surfaces dry after rain
  • Deck drainage collected in closed pipes with silt traps and discharged to a controlled outfall, never as sheet flow into the lake
  • No unpainted weathering steel within 1 m above water level or in the zone wetted by wave action and boat wash
  • Railings, kerbs and deck plate detailed so debris, leaves and litter cannot lodge
  • Access ladders and inspection walkways provided for maintenance from deck and water side

Corrosion-Resistant Corten Steel Truss Bridge for Prefabricated Lakeside Crossing

Structural Configuration
  • Through-truss, pony truss or deck-truss arrangement chosen for the required clearance and the visual line of the lake
  • Slender panel proportions for landscape sensitivity, with optional curved chord or arch accent
  • Steel deck plate, precast concrete panels or timber deck to suit pedestrian, cycle or light vehicle use
  • Piers: steel piles with corrosion allowance and sleeving, concrete piers, or abutments set back from the waterline
  • Bearings and expansion joints raised, drained and accessible, never located where silt can accumulate
Deck, Drainage & Environment
  • Deck slope not less than 1.5% with continuous gutters where stormwater collection is required
  • Coating systems free of hazardous leachables; no solvent-based coating applied over water without containment
  • Construction planned to minimise in-water work: prefabricated modules lifted or barged into place
  • Work windows, silt curtains and spill response aligned with local environmental permits
  • Bird-deterrent and anti-fouling provisions available for high-fouling lakeside locations
Fabrication & Coating Quality
  • Welding to AWS D1.5 or EN 1090-2 up to EXC3, with WPS/PQR and welder records retained
  • Shot blasting to Sa2.5 before coating, with surface salt contamination tested and recorded before priming
  • Coating thickness verified by DFT gauge at defined grid points, holiday testing on immersion-adjacent surfaces
  • Galvanizing to ASTM A123 / ISO 1461 with thickness checks and drainage hole verification
  • Heat number traceability from mill certificate to member, recorded on the as-built set
  • Hold points: material, fit-up, welding, NDT, coating, trial assembly and packing
Trial Assembly

Full or matched-segment trial assembly on levelled beds verifies camber, panel geometry, splice fit and bolt-hole alignment. Every member is match-marked with its erection sequence and connection group, and the assembly report with dimensional records ships with the goods — critical for lakeside sites where site rework is expensive and access is restricted.

Erection Over Water
  • Lifting plan per module with rigging, centre of gravity and wind limits defined
  • Barge-mounted crane or launching with nose girder where bank access is limited
  • Temporary works designed to avoid disturbing the lake bed, with floating plant and silt control agreed in advance
  • Erection sequence planned so no member is left unbraced overnight in a wind-exposed location
  • Erection manual, torque schedule and QR-coded member index issued before delivery

Corrosion-Resistant Corten Steel Truss Bridge for Prefabricated Lakeside Crossing

Lifecycle & Commercial
  • Zoned protection avoids over-specifying the whole bridge while protecting the zones that actually corrode
  • Bare Corten above deck removes repainting from the maintenance budget across the majority of the surface area
  • Coating maintenance intervals estimated per zone and stated in the O&M manual so the owner can plan expenditure
  • FOB, CIF, CFR or DAP terms, T/T or L/C at sight, production typically 35–50 days after drawing approval
Documentation
  • Design calculations, shop drawings, mill certificates with heat numbers, WPS/PQR and welder qualifications
  • NDT reports, coating and galvanizing records with DFT results, dimensional and camber records
  • Trial assembly report, packing list with QR-coded member index, erection drawings
  • O&M manual including the zone-based maintenance plan
Next Step

Send the span, clearance, deck width, anticipated live loads, water level range and water chemistry data such as pH, chloride and sulfate if available. We return a corrosion strategy proposal, preliminary 3D model and budgetary quotation within 5 working days.