Product Details
Place of Origin: Hangzhou, Zhejiang, China
Brand Name: FAMOUS
Certification: ISO 9001:2015, SGS inspected, CE
Model Number: FAMOUS-MTB-A588
Payment & Shipping Terms
Minimum Order Quantity: 1000 Tons
Price: USD 1200 - 2600 / Ton
Packaging Details: Modules bundled in erection sequence on steel pallets with dunnage, splice plates and bolt sets per joint, seaworthy export packing
Delivery Time: 25 - 45 days after drawing approval
Payment Terms: L/C,D/A,D/P,T/T
Supply Ability: 2000 Tons per Month
Steel Grade: |
ASTM A588 Grade A / B Corten Weathering Steel |
Configuration: |
Repeating Shop Built Truss Modules |
Interchangeability: |
Single Jig Built, Jig Drilled Splice Plates |
Connection: |
A325 / A490 High Strength Friction Grip Bolts |
Field Work: |
Lifting And Bolting Only, No Site Welding |
Span Strategy: |
Fixed Span Or Extendable By Adding Modules |
Surface Strategy: |
Bare Weathering With Zoned Galvanizing |
Welding Standard: |
AWS D1.5 With UT And MT Inspection |
Delivery: |
Bundled In Erection Sequence With Module Schedule |
Steel Grade: |
ASTM A588 Grade A / B Corten Weathering Steel |
Configuration: |
Repeating Shop Built Truss Modules |
Interchangeability: |
Single Jig Built, Jig Drilled Splice Plates |
Connection: |
A325 / A490 High Strength Friction Grip Bolts |
Field Work: |
Lifting And Bolting Only, No Site Welding |
Span Strategy: |
Fixed Span Or Extendable By Adding Modules |
Surface Strategy: |
Bare Weathering With Zoned Galvanizing |
Welding Standard: |
AWS D1.5 With UT And MT Inspection |
Delivery: |
Bundled In Erection Sequence With Module Schedule |
Long truss bridges usually run into the same three constraints: how the span is transported, what the site crane can lift, and how much work has to happen at height. A one-piece truss solves none of them. This bridge is divided into repeating plate truss modules that are shop built to the same jig, shipped as standard modules inside containers, and bolted together on site in sequence. The span is extended by adding modules, so one design family covers a range of crossings, and a damaged or relocated module can be replaced without rebuilding the bridge.
![]()