Send Message

Hangzhou FAMOUS Steel Engineering Co.,Ltd. 

 

USA-EUROPE Standard Engineering and Quality Control Build Our Brand Reliability!  One Trial Order Bring Constant Cooperation!

www.steelfabricat.com

 

Home ProductsSteel Bailey Bridge

Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified

Certification
China FAMOUS Steel Engineering Company certification
China FAMOUS Steel Engineering Company certification
Good team members always offer budget in time and answer questions with patience, great job!

—— Donald Mcwayne

I am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.

—— Joseph Alexander

I'm Online Chat Now

Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified

China Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified supplier
Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified supplier Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified supplier Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified supplier Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified supplier

Large Image :  Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified

Product Details:

Place of Origin: Zhejiang, China
Brand Name: HONFENG
Certification: ISO9001:2008
Model Number: OWN

Payment & Shipping Terms:

Minimum Order Quantity: 1 pcs
Price: USD850~USD1200 per ton
Packaging Details: Seaworthy packings into container or bulk vessel
Delivery Time: Based on client's needs
Payment Terms: L/C,T/T
Supply Ability: 600,000 tons per Year
Detailed Product Description
Name: Steel Bailey Truss Bridge Material: Q345B-Q460C,etc.
Model: CB100/200(321-Type)&HD200 Type: Modular Deck -type Assembly Steel Bridges
Application: Water Conservancy Project,Temporary Or Permanent Steel Structure Bridge,etc. Color: Army Blue, Light Gray, Hot Galvanized Or Customized.etc
Standard: AISI, ASTM, BS, DIN, GB, JIS
High Light:

Medium Span Steel Bailey Bridge

,

Bailey Steel Bridge Truss Assembly

Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified

Description:
Steel Bailey Truss Bridges which are portable steel bridge have been widely used in various fields, its most important feature is to achieve a variety of spans, bear carrying capacity, light and handy components, easy to dismantle and strong adaptability can be quickly completed with simple tools and manpower.

 

The surface protection can be paint or hot-dip galvanized.

 

Jiangsu Jiuzhou Bridge Engineering Co.,Ltd.(shortly called as JBEC) lies in Huashan Village, Yaoqiao Town, New District of beautiful city-- Zhenjiang, Jiangsu Province. It covers an area of 80,000 square meters. The traffic is very convenient. It is 30 kilometers away from Changzhou Airport and five kilometers from Huning Motorway Entrance& Exit. By Train it is only 1 hour away from Shanghai, the largest city of China.

 

Prefabricated Steel Bailey Bridges are normally built on site from a pre-engineered system of ready-to-assemble components. Utilizing standardized prefabricated components, Bailey bridges can be built to match a wide range of vehicular bridging applications. Because of their excellent versatility and overall value, thousands of Bailey bridges have been installed throughout the world.

 

Most importantly, not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence. Warmly welcome all friends and clients from International market to visit us.

 

Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified 0

 

Specifications:

Product Name Steel truss bailey bridge
Width Standard roadway: 3.15m/4.2m(single lane) Single lane:30ft-200ft
  Standard roadway: 7.35m(single lane) Double lane:30ft-200ft
Bridge deck Anti-slip steel decking floor, Concrete/Asphalt road,Timber deck,etc.
Steel grade Q345B (equivalent to ASTM A572)
Bridge type CB100, CB200
Loading capacity 20ton, 40ton truck,etc. or HS20-44, HS25-44/Truck 20
Corrosion Original painted or Hot dip galvanized
Advantages Cost-effective and technical full analysis and supports

 

 

Features
1. High strength and big stiffness , relative to the concrete bridge can be reduced trabecular high and self-respect
2. Due to the steel isotropic, quality of a material is uniform and modulus of elasticity, that make steel bridge in the working condition and calculation compared with the assumption
3. Steel bridge generally USES factory, site splicing, the construction period is short, processing convenient and not affected by seasonal effect.
4. Steel bridge is suitable for industrialized manufacture and very convenient to transport.
5. Steel bridge is easy to repair and replace,long lifetime,material can be recycled.

 

Application
Beam bridge,arch bridge,rigid frame bridge,cable-stayed bridge,suspension bridge. passenger foot-bridge
Mixture form to erect all kinds of Temporary Bridges, Emergency Bridges and Fixed Bridges.
Using the bridge equipment, the suspension bridges of varied span can be erected.
The bridge has the advantages of few components, light weight and low cost.
Bailey Bridge requires no special tools or heavy equipment for construction, the bridge elements are small enough to be carried in , and the bridge is strong enough to carry . It is considered a great example of military engineering.
The compact 200 panel bridge: The compact 200 panel bridge is similar to the compact 100 panel
bridge from their appearance. The difference is its increased panel height to 2.134m. It employed the method of alternating joints between Reinforcement Chords and the joints between panels. This method can decrease inelastic deformation caused by the oversized pinholes.
Pre-arch method is used to additionally cut down mid-span and vertical deflection to a larger degree.
Bolt-connected components use the orienting sleeve- fixing method to increase accuracy of connections. Shear is created in orienting sleeves and tension is developed in bolts, which increase the usage life of the bolts and ensure the safety of panel bridges. Wind resistant brace is made to be composite type and is connected to transom/girders to improve overall stability of panel bridges.
 

Competitive Advantage:

 

Heavy loading capacity

Great stability

Long fatigue life

Light weight

Low cost
Easy and fast erection

 

 

Finally we would like to emphasize that not like other companies, nearly all machining parts and mechanical accessories are manufactured in our own shop as we have so many wonderful machines and workers inside. In this way, the quality, cost and delivery time can be ensured which eliminates other exterior factors’ influence.

Warmly welcome all friends and clients from International market to visit us!

Australia Standard Stable Fortified Medium Span Bailey Bridge Steel Bridge Truss Assembly New Zealand Certified 1

 

 

Contact Details
FAMOUS Steel Engineering Company

Contact Person: Rabia

Tel: +8615990090451

Send your inquiry directly to us (0 / 3000)