Send Message
FAMOUS Steel Engineering Company
products
products
Home > products > Industrial Steel Buildings > Fast Erection Prefabricated Steel Framed Buildings Sandwich Panels

Fast Erection Prefabricated Steel Framed Buildings Sandwich Panels

Product Details

Place of Origin: Zhejiang, China

Brand Name: HONFENG

Certification: ISO9001:2008, SGS, etc.

Model Number: OWN

Payment & Shipping Terms

Minimum Order Quantity: 1 pcs

Price: USD1150~USD1750 per ton

Packaging Details: Seaworthy packings into container or bulk vessel

Delivery Time: Based on client's needs

Payment Terms: L/C,T/T

Supply Ability: 600,000 tons per Year

Get Best Price
Highlight:

steel buildings

,

prefab steel buildings

Frame Type:
Clearspan
Material:
Structural Steel
Charges:
Free
Steel Grade:
ASTM A572 Or Q345B
Building Type:
Prefabricated Building
Application:
Supermarket
Framing System:
Beam And Column System
Wall Material:
Steel Sandwich Panels
Design Methods:
ASD
Code Of Steel Construction:
ASTM Standards
Frame Type:
Clearspan
Material:
Structural Steel
Charges:
Free
Steel Grade:
ASTM A572 Or Q345B
Building Type:
Prefabricated Building
Application:
Supermarket
Framing System:
Beam And Column System
Wall Material:
Steel Sandwich Panels
Design Methods:
ASD
Code Of Steel Construction:
ASTM Standards
Fast Erection Prefabricated Steel Framed Buildings Sandwich Panels

Fast Erection Prefabricated Steel Framed Buildings Sandwich Panels

 

 

Feature Pre-Engineered Steel Buildings
Design Criteria AISC, MBMA, AWS
Structural Base Material All primary & secondary steel used by Mammut Building System has minimum yield strength of 50 KSI (345 N/mm2).
Foundation Simple design easy to construct and light weight
Delivery Average 6 to 8 weeks.
Sourcing & Coordination Building is supplied complete withCladding and all accessories, including erection if required, all from one source of supply.
Structure Weight About 30% lighter through the-efficient use of steel. Primary framing members are (varying depth) tapered built-up plate sections with large depths in the areas of highest stress. Secondary members are light gage (light weight) cold formed (low labor cost) “Z” - or“C” shaped members.Z purlins / girts can be lapped. Lapping reduces the deflection, and allows double thickness at the points of higher stresses (support points).
Design Quick and efficient since standardization of P.E.B. has significantly reduced design time. Basic designs are used over and over. Specialized computer analysis and design programs reduce design time and optimize material required. Drafting is also computerized with minimal manual drawings. Design, detail drawings and erection drawings are supplied free of charge by the manufacturer. Approval drawings may be prepared within 10 days to 3 weeks. Consultant in-house design and drafting time is significantly reduced, allowing more time for coordination and review, and increasing margins in design fees. Since most of the PEB are pin-based, the cost is reduced due to smaller sections at the base with smaller base plates and foundations (in absence of moments).
AccessoriesWindows, Doors,Ventilation etc. Designed to fit the system, with standardized, interchangeable parts, including pre-designed flashing and trims. Mass produced for economy. All available with the building.
Erection Easy, fast, step by step. Erection costs & time are accurately known, based upon extensive experience with similar buildings.
Architecture Outstanding architectural design at low cost. Conventional wall, and fascia materials, such a concrete, masonry and wood, can be utilized.
Overall Price Price per square meter may be as much as 40% lower than conventional steel.
Changes Very flexible, tailor made, accepts changes and revisions easily. Future expansion is simple, easy and cost effective. One supplier to co-ordinate changes.
Performance All components have been specified and designed specifically to act together as a system, for maximum efficiency, precise fit up, and performance in the field conditions world wide has resulted in design improvements over time which allow dependable prediction of performance.
Responsibility Single source of supply results in total responsibility for one supplier, including design liability.