Send Message

Hangzhou FAMOUS Steel Engineering Co.,Ltd. 

 

USA-EUROPE Standard Engineering and Quality Control Build Our Brand Reliability!  One Trial Order Bring Constant Cooperation!

www.steelfabricat.com

 

Home ProductsGlass Curtain Wall

Double Layer Insulation Glass Curtain Wall Stick Built System Transparant

Certification
China FAMOUS Steel Engineering Company certification
China FAMOUS Steel Engineering Company certification
Good team members always offer budget in time and answer questions with patience, great job!

—— Donald Mcwayne

I am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.

—— Joseph Alexander

I'm Online Chat Now

Double Layer Insulation Glass Curtain Wall Stick Built System Transparant

China Double Layer Insulation Glass Curtain Wall Stick Built System Transparant supplier
Double Layer Insulation Glass Curtain Wall Stick Built System Transparant supplier Double Layer Insulation Glass Curtain Wall Stick Built System Transparant supplier Double Layer Insulation Glass Curtain Wall Stick Built System Transparant supplier Double Layer Insulation Glass Curtain Wall Stick Built System Transparant supplier Double Layer Insulation Glass Curtain Wall Stick Built System Transparant supplier Double Layer Insulation Glass Curtain Wall Stick Built System Transparant supplier

Large Image :  Double Layer Insulation Glass Curtain Wall Stick Built System Transparant

Product Details:

Place of Origin: Zhejiang, China
Brand Name: Fasecbuildings
Certification: ISO9001:2008
Model Number: Unitized

Payment & Shipping Terms:

Minimum Order Quantity: 1 sqm
Price: USD100-550 per sqm
Packaging Details: Standard waterproof paper and steel framed or wooden box
Delivery Time: Based on client's needs like one month
Payment Terms: L/C,T/T, D/A, D/P, Western Union
Supply Ability: 600,000 sqm per Year
Detailed Product Description
Specification: Unitized Glass Facade Material: Glass And Aluminum Frame
Coating: PVDF And Powder Coated Color: Transparant
High Light:

glass curtain walling

,

structural glass curtain wall

Double Layer Insulation Glass Facade Curtain Wall Stick Built System By China Maker


Quick Detail:
1. Unitized curtain wall for quick installation

2. Aluminum and glass unitized facades

3. insulated and laminated triple glass units

 

After years’ development, our group has evolved into an integral turn-key contractor for various buildings and construction. So we have capacity in various huge projects design & build based on satisfactory budget control. Welcome clients to make enquiries directly on whatever kind of building engineering or building surrounding materials pricing. Our professional engineering teaam are all ready here to offer customized design and price. Our pricinple is One Trial Order Bring Constent Cooperation!


Specification:

Material: specification:
Length 4m or as per customer's requirement
Width 1.5m or as per customer’s requirement
Height 0.2m or as per customer’s requirement

 

Unitized glass curtain wall systems are composed of large glass units that are created and glazed within a factory and then sent to the construction site. Once arriving on site, the units can then be hoisted onto anchors connected to the building whatever concrete or steel buildings. High quality, due to tight tolerances of fabrication in a climate-controlled environment, is only one hallmark of this type of system. Because there is no on-site glazing, another major benefit of using a unitized system is the quicker speed of installation. The system can be installed in a third of the time of a stick-built system which means a lot of site time saving. This system is well suited for cases where there is a large volume of prefabricated unitized panels required, where there are higher field labor costs (thereby shifting the labor to a more cost-effective factory work force), where higher performance is needed (for wind loads, air/moisture protection, seismic/blast performance), for taller structures, and more regular conditions for panel optimization.

 

Double Layer Insulation Glass Curtain Wall Stick Built System Transparant 0

Only one unit-to-unit splice (usually a silicone sheet or patch) needs to be field-sealed, and only one anchor per mullion needs to be attached to the face or top of the floor slab. Interlocking unitized glass curtainwall frame members are weatheripped to seal to one another, both horizontally and vertically. This accommodates thermal expansion and contraction, inter-story differential movement, concrete creep, column foreshortening, and/or seismic movement. Most unitized curtainwall systems are installed in a sequential manner around each floor level, moving from the bottom to the top of the building.

 

Application

 

HOW TO CHOOSE FROM STICK and UNITIZED CURTAINWALL SYSTEMS
Selection Criteria Stick Curtainwall Unitized Curtainwall
Project Size Small Large
Wall Configuration

Complex

(Many changes in plane, e.g. soffits, corners, etc.)

Repetitive

(Large expanses of flat wall)

Joint Pattern Random Uniform horizontal sill line
Glazing Field Factory
Inter-story Movements Very limited Inter-locking frames accommodate movements
Quality Control

Subject to site variables

(Both environment and equipment)

Controlled factory conditions
Modification Can be cut-to-fit in the field Pre-engineered
Sealing Subject to site variables Minimal field sealing
Field Labor Cost

High

(Many parts to track and assemble)

Low
Field Labor Duration Slow

Fast

(Often setting 75 sqft or more per unit)

Access and Safety Exterior access required

Set from the interior

(Exterior optional)

 

 

Although unitized, pre-glazed curtain wall system is particularly suited to high-rise building construction or projects with large quantities of module repetition or whenever 4-sided capless system is required; it is also used popularly on any size project that demands it.

Whether your project requires a standard or custom framing system, we are capable to design, fabricate and install the glass façade curtain wall as per your needs, by providing a quality product.

Double Layer Insulation Glass Curtain Wall Stick Built System Transparant 1

All our pre-glazed façade curtain wall systems are fabricated, assembled and glazed within the controlled environment of our manufacturing facility. This will bring greater quality control and the ability to pre-construct our frame modules before the building’s structure is erected; it’s also very helpful to accelerate the close-in of the building, since our installation team can work on sections of the building as they become available; while minimizing delays due to weather conditions.

 

Nowadays the unitized curtain wall system have become the preferred method for enclosing buildings, as more building owners, architects and contractors conclude the benefits of this type of construction. Unitized systems allow buildings to be enclosed quickly, which can help to speed up the construction process leading to earlier occupation. The fabrication process for unitized systems is more consistent than for stick-built curtain walls, as unitized wall systems are constructed in almost an assembly line fashion, indoors, and under controlled environmental conditions.

 

 

Contact Details
FAMOUS Steel Engineering Company

Contact Person: Mr gao

Tel: +8618072735884

Send your inquiry directly to us (0 / 3000)