Send Message

Hangzhou FAMOUS Steel Engineering Co.,Ltd. 

 

USA-EUROPE Standard Engineering and Quality Control Build Our Brand Reliability!  One Trial Order Bring Constant Cooperation!

www.steelfabricat.com

 

Home News

The main tower of the Hutong Yangtze River Bridge was built up to 330 meters, and the main span was completed in September this year.

China FAMOUS Steel Engineering Company certification
China FAMOUS Steel Engineering Company certification
Good team members always offer budget in time and answer questions with patience, great job!

—— Donald Mcwayne

I am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.

—— Joseph Alexander

I'm Online Chat Now
Company News
The main tower of the Hutong Yangtze River Bridge was built up to 330 meters, and the main span was completed in September this year.

At 8 o'clock on June 27, with the completion of the concrete pouring of the last party, the south main tower of the Hutong Yangtze River Bridge, which was constructed by the China Railway Corporation, the design of the China Railway Bridge and the construction of the China Railway Bridge Bureau, was successfully capped. So far, the two bridges are up to 330m. The main tower was completed.

 

The Hutong Yangtze River Rail-to-Use Railway Bridge has a total length of 11072m, a main bridge length of 2296m and a main span of 1092m. It is the largest spanned cable-stayed bridge in China and the world's first super-km-long cable-stayed bridge. The bridge is the control project of the entire line of Hutong Railway. It is also a “three-in-one” function of the national railway, intercity railway and expressway. It is designed as the upper layer for the Hutong Railway, Tongsujia Intercity Railway and Xitong Expressway. 6 lane highway, lower 4 lane railway.


The steel used in the bridge project is about 480,000 tons, which is equivalent to the steel used in 12 "Bird's Nest"; the concrete is 2.3 million m3, which is equivalent to the use of 8 national grand theatres. The bridge is made of new materials such as Q500qE high-strength steel and 2000Mpa parallel steel wire stay cables. Its large scale of engineering, high construction difficulty, and a large number of scientific and technological innovations have created the world's bridges and many of China's bridge construction, representing the highest level of bridge construction in China and the world at present.

Pub Time : 2019-06-27 17:31:26 >> News list
Contact Details
FAMOUS Steel Engineering Company

Contact Person: Mr. Tomy.GAO

Tel: 86-571-87688170

Fax: 86-571-56389287

Send your inquiry directly to us (0 / 3000)