Send Message

Hangzhou FAMOUS Steel Engineering Co.,Ltd. 

 

USA-EUROPE Standard Engineering and Quality Control Build Our Brand Reliability!  One Trial Order Bring Constant Cooperation!

www.steelfabricat.com

 

Home News

Construction of the new bridge of Qiantang River supporting the Hangzhou Asian Games

China FAMOUS Steel Engineering Company certification
China FAMOUS Steel Engineering Company certification
Good team members always offer budget in time and answer questions with patience, great job!

—— Donald Mcwayne

I am feeling fully respected when taking with Grace and she always gave the best advice. The first batch of the bridge panels got are great too. thanks all.

—— Joseph Alexander

I'm Online Chat Now
Company News
Construction of the new bridge of Qiantang River supporting the Hangzhou Asian Games

A few days ago, the new transportation bridge project of Hangzhou Asian Games, the new bridge of Qiantang River, was officially started. It is expected to be completed before the opening of the Asian Games in 2022. As a key project of the Hangzhou section of the Shanghai-Hangzhou-Ningbo Expressway, the completion of the bridge is of great significance to promote the development of Zhejiang Dawan District, Metropolitan Area and Hangzhou City.

 

The new Qiantang River Bridge is located on the downstream side of the Pengyu Bridge. It has a total length of 1350.8 meters and is divided into two upper and lower floors. The upper level is the elevated expressway and the lower level is the double-line fast track. The airport track express line crosses the Qiantang River from here. After the completion of the bridge, it will further support the development strategy of Hangzhou's eastward expansion and support the river, and improve the internal traffic of the city; connecting Xiaoshan Airport, Qianjiang Century City, Qianjiang New City and East Station Hub will become an important commuter passage for Hangzhou citizens.

 

It is understood that the Hangzhou section of the Shanghai-Hangzhou-Ningbo Expressway has a total length of 23.6 kilometers. In addition to the main toll station, the entire line is in the form of a viaduct. The viaduct adopts the first-class highway construction standard, and the design speed is 80 km to 100 km. The ground road adopts the first-class highway construction standard and takes into consideration the urban road function, and the design speed is 60 km.

Pub Time : 2019-06-14 16:41:59 >> News list
Contact Details
FAMOUS Steel Engineering Company

Contact Person: Mr. Tomy.GAO

Tel: 86-571-87688170

Fax: 86-571-56389287

Send your inquiry directly to us (0 / 3000)